
Judul | Laporan Kuliah Kerja Praktek (KKP) pada PT. Bosowa Energi PLTU Jeneponto Coal Fired Steam Power Plant 2 x 125 MW : Kuliah Kerja Praktek / Rendi Payung Allo |
Pengarang |
ALLO, Rendi Payung |
EDISI |
2019 |
Penerbitan |
Makassar : Politeknik ATI Makassar - Teknik Industri Agro, 2019 |
Deskripsi Fisik |
xi, 65 halaman :Gambar ;20x29 cm |
Subjek |
Laporan Praktek TIA 2019 |
Catatan |
Laporan Praktek TIA 2019 |
Lokasi Akses Online |
OPAC (Rak KKP TIA 2019) |
Tag | Ind1 | Ind2 | Isi |
001 | INLIS000000000002647 | ||
005 | 20220121125233 | ||
035 | # | # | $a 0010-0122001322 |
082 | # | # | $a (R)2019 LKKP-TIA 818 |
084 | # | # | $a (R)2019 LKKP-TIA 818 ALL l |
100 | 1 | # | $a ALLO, Rendi Payung |
245 | 1 | # | $a Laporan Kuliah Kerja Praktek (KKP) pada PT. Bosowa Energi PLTU Jeneponto Coal Fired Steam Power Plant 2 x 125 MW : $b Kuliah Kerja Praktek /$c Rendi Payung Allo |
250 | # | # | $a 2019 |
260 | # | # | $a Makassar :$b Politeknik ATI Makassar - Teknik Industri Agro,$c 2019 |
300 | # | # | $a xi, 65 halaman : $b Gambar ; $c 20x29 cm |
500 | # | # | $a Laporan Praktek TIA 2019 |
650 | # | 4 | $a Laporan Praktek TIA 2019 |
856 | # | # | $a OPAC (Rak KKP TIA 2019) |
990 | # | # | $a 126/LKKP TIA 2019 |
Content Unduh katalog
Karya Terkait :