00721 2200193 4500001002100000005001500021035002000036245016200056100002100218250000900239300006000248856002700308260007100335082002300406084002900429650002500458500002500483990001900508INLIS00000000000521420220321022745 a0010-03220006111 aPerhitungan Jumlah Air Hilang (Evaporasi) pada Cooling Tower PT. Consolidated Electric Power Asia Sengkang (PLTGU Sengkang) :bTugas Akhir /cMuhammad Kaisar1 aKAISAR, Muhammad a2016 axiii, 45 halaman :bTabel, gambar, grafik ;c20,5x28 cm aOPAC (Rak TA TKI 2016) aMakassar :bPoliteknik ATI Makassar - Teknik Kimia Industri,c2016 a(R)2016 TA-TKI 818 a(R)2016 TA-TKI 818 KAI p 4aTugas Akhir TKI 2016 aTugas Akhir TKI 2016 a02/TA TKI 2016