00712 2200193 4500001002100000005001500021035002000036245014800056100002000204250000900224300005000233856002800283260007100311082002500382084003100407650002900438500002900467990002200496INLIS00000000000444020220215112542 a0010-02220010511 aLaporan Kuliah Kerja Praktek PT. Bosowa Energi PLTU Jeneponto Coal Fired Steam Power Plant 2 x 125 MW :bKuliah Kerja Praktek /cSupriadi Nasir1 aNASIR, Supriadi a2017 aix, 34 halaman :bTabel, Gambar ;c20,6x28 cm aOPAC (Rak KKP TMI 2017) aMakassar :bPoliteknik ATI Makassar - Teknik Mesin Industri,c2017 a(R)2017 LKKP-TMI 818 a(R)2017 LKKP-TMI 818 NAS l 4aLaporan Praktek TMI 2017 aLaporan Praktek TMI 2017 a228/LKKP TMI 2017