00893 2200229 4500001002100000005001500021035002000036245019800056100001600254250000900270300006500279856002800344260008800372082002400460084003000484650002600514500002600540008003900566700001500605700002300620990002000643INLIS00000000000367420250109021741 a0010-02220002851 aPerencanaan Persediaan Pengaman (Safety Stock) Spare Part Wiring Harnes Front pada PT. Hyundai Indonesia Motor Bekasi Barat :bTugas Akhir /cIin Novera (114959); Amrin Rapi; Setya Bakti Fattah0 aIIN, Novera a2014 axi, 37 halaman :bTabel, Gambar ;c20,8x28,5 cmebibliografi aOPAC (Rak TA T&MI 2014) aMakassar :bAkademi Teknik Industri Makassar - Teknik dan Manajemen Industri,c2014 a(R)2014 TA-T&MI 818 a(R)2014 TA-T&MI 818 IIN p 4aTugas Akhir T&MI 2014 aTugas Akhir T&MI 2014250109 | | | 0 aAMRIN Rapi0 aSETYA Bakti Fattah a45/TA T&MI 2014