00881 2200217 4500001002100000005001500021035002000036245019900056100002200255250000900277300007800286856004500364260007000409082002300479084002900502650002500531008003900556700002400595700002500619990001900644INLIS00000000001291220241120121621 a0010-09240000751 aPenerapan Metode Reliability Centered Maintenance (RCM) Alat Berat Excavator pada PT. Caputra Mitra Sejati :bTugas Akhir /cAbdurahman Askar (21TIA795); Nur Khaerani Busri; Rianti Indah Lestari3 aASKAR, Abdurahman a2024 axii, 41 halaman :bgambar, tabel ;c20,5 x 29,5 cmebibliografi; lampiran aOPAC (Ruang Referensi - Rak TA TIA 2024) aMakassar :bPoliteknik ATI Makassar - Teknik Industri Agro,c2024 a(R)2024 TA-TIA 818 a(R)2024 TA-TIA 818 ASK p 4aTugas Akhir TIA 2024241120 | | | 3 aBUSRI, Nur Khaerani0 aRIANTI Indah Lestari a15/TA TIA 2024